Alameda County's ADU Resource Center puts the all-in cost of an ADU (design, permits and construction) at $450 to $550 per square foot, and says most projects take 12 to 18 months from start to finish. A simple interior junior ADU conversion can be about $30,000. Converting a garage avoids building a new foundation, walls and roof, but the kitchen and bathroom are major costs: the county lists $25,000 to $50,000 for a kitchen and $15,000 to $25,000 for each bathroom.
ADU cost ranges in Alameda County
| Item | Typical cost |
|---|---|
| Construction only, average project | $425–$500 per sq ft |
| All-in: design, permits and construction | $450–$550 per sq ft |
| Simple interior junior ADU (JADU) conversion | About $30,000 |
| ADU kitchen | $25,000–$50,000 |
| Each ADU bathroom | $15,000–$25,000 |
| Large hillside detached ADU, high-end finishes | $400,000 or more |
The 2025 Cost vs. Value report lists $203,481 for its sample accessory dwelling unit in the San Francisco market, with 34.3% of the cost recouped at resale.
How long it takes
The county says construction usually takes 6 to 12 months and most ADU projects take 12 to 18 months end to end, counting design and permits. Some take 24 months or more. A garage conversion that stays inside the existing structure is usually on the shorter end.
Garage conversion, junior ADU or detached ADU?
When a garage is converted to an ADU, California law generally does not let cities require the lost parking spaces to be replaced.
- Garage to living space: a family room, office or bedroom with a bathroom for your own household. It needs permits but not ADU approval.
- Garage to ADU: a separate home with its own kitchen, bathroom and entrance that can be rented. It must meet ADU rules and building code.
- Junior ADU: a unit of up to 500 sq ft inside the main house, often the lowest-cost option.
- Detached ADU: a new building in the yard. It is the most flexible option and usually the most expensive.
Livermore and Tracy rules to know
- Livermore offers pre-approved ADU plans that can be used citywide, with an expedited plan review and lower permitting costs.
- Tracy offers pre-approved ADU plans of 498, 800 and 1,200 sq ft. The city lists 20 business days for the first plan review.
- Tracy requires solar on new ADUs, and development and school impact fees may apply above certain sizes.
- Contractors building in Tracy need a City of Tracy business license as well as a state contractor license.
- California's housing department sent both Livermore and Tracy letters in October 2025 asking them to update their ADU ordinances to match state law, so check current local rules before you design.
A QRS garage conversion
Follow a garage conversion step by step: new walls, insulation, a sliding glass door, bathroom drains set into the slab, water lines, then flooring, paint and lighting.
Garage conversion project · Garage and ADU conversions service
Sources
- Alameda County ADU Resource Center: Construct
- Zonda / JLC, Cost vs. Value 2025: San Francisco
- City of Livermore: Pre-approved ADU program
- City of Tracy: Accessory Dwelling Units
- California HCD: Accessory Dwelling Units
Last updated November 21, 2026 by QRS Remodeling, CSLB #1057886. Published figures are benchmarks, not quotes.

